Fairy tale house construction company. Construction company "skazka"

This is a close-knit team of specialists who know and love their work. We have established ourselves as a stable and reliable company, which respects its Customers and protects its reputation. Gratitude from our Customers for the excellent design and construction work wooden houses- the best confirmation of our high level.

Construction company"Fairy tale"- performs a full cycle of work on creating a wooden house, we offer:

  • wooden house projects, cottages and baths,
  • construction of wooden houses for standard and individual projects,
  • construction of baths from logs and timber.

On January 1, 2010, the Russian construction industry switched to self-regulation and the issuance of licenses for construction work ceased. In accordance with the law, construction, design and survey companies must join self-regulatory organizations and obtain certificates of admission to certain types of work (Order of the Ministry of Regional Development dated December 30, 2009 N 624 “On approval of the list of types of work on engineering surveys, preparation project documentation, construction, reconstruction, major renovation capital construction projects that affect the safety of capital construction projects").

Clause 2. This list does not include types of work on the preparation of project documentation, construction, reconstruction, major repairs in relation to objects for which the issuance of a building permit is not required in accordance with “clauses 1 - 4”, “5 of Part 17 Article 51" of the Town Planning Code Russian Federation(Collected Legislation of the Russian Federation, 2005, N 1, Art. 16; 2006, N 1, Art. 21; 2008, N 30, Art. 3616; 2009, N 48, Art. 5711; 2010, N 48, Art. 6246 ; 2011, No. 1688; No. 3880, Art. 4572, Art. 4591), as well as in relation to individual residential buildings more than three, intended to accommodate no more than two families); residential buildings with no more than three floors, consisting of several blocks, the number of which does not exceed ten and each of which is intended for one family, has a common wall (common walls) without openings with the neighboring block or neighboring blocks, is located on a separate plot of land and has access to the territory public use(blocked residential buildings); apartment buildings with a number of floors of no more than three, consisting of one or more block sections, the number of which does not exceed four, each of which contains several apartments and common areas and each of which has a separate entrance with access to the common area. (as amended by the "Order" of the Ministry of Regional Development of the Russian Federation dated November 14, 2011 N 536) Types of work on the preparation of project documentation contained in the List can be performed individual entrepreneur independently (personally), and types of work on engineering surveys, construction, reconstruction, major repairs - only with the involvement of workers in the manner prescribed by the “legislation” of the Russian Federation. (paragraph introduced by “Order” of the Ministry of Regional Development of the Russian Federation dated June 23, 2010 N 294)

Companies engaged exclusively in low-rise construction of dachas, cottages or townhouses, and falling under the exceptions of the order of the Town Planning Code, are not required to join an SRO.

Our builders have more than 10 years of experience in the construction of wooden houses. The construction of each facility is constantly monitored by a qualified construction foreman, he checks the quality of the work performed at different stages of construction, and also coordinates all emerging issues with the Customer. We always strive for mutual understanding with our Customers and strictly comply with our contractual obligations. If errors occur, we do not shy away from correcting them and provide a guarantee for all construction work. Payment for construction work of houses in our company is carried out in several stages.

Construction company "Skazka" all year round builds wooden houses, takes into account all the wishes of the Customer, competently links the object to the area. In our office we are pleased to offer you finished projects wooden houses, from which you can choose the most suitable and convenient project. We will always help you choose the optimal configuration for your home and tell you in detail about the features of a particular solution. During the implementation of design and construction work You will be provided with the most detailed information about their performance.

905,000 rub.

House made of timber FAIRY TALE

Price: from 905,000 rub.

Total area: 154 m²
Dimensions: 10.8 by 10.6 m

Porch country mansion according to this project, built inside the main room. From there we go into the vestibule, parallel to it there is a san. knot, and go out into the hallway. On the left is the living room, we use it as we wish, we directly enter the spacious living room with an area of ​​28 sq. m. m, it combines a kitchen with a dining room. The entrance to the boiler room is located separately. On attic floor there are four bedrooms and a bathroom.

The presence of many rooms will allow the owners and guests of the cottage to spend time, as in a “fairy tale”.

You can FREE change this project or order a custom one to your liking

Reviews and gallery of the project's work:

More

Equipment:

House set made of timber 150x150 mm.


The house package includes:

House made of timber 150x150 mm.

Internal partitions – timber 100x150 mm.

Subfloor - board 25x150.

The roof gables are timber 150x150 mm.

Roof covering with roofing felt.


Delivery

Get a free consultation

905,000 rub.

House set made of profiled timber 140x140 mm.


The house package includes:

House made of profiled timber 140x140 mm.

The clear height of the 1st floor is 2.7m.

The clear height of the 2nd floor is 2.5m.

Connecting the corners - in a dressing with a root tenon

The beam is fastened with a wooden dowel.

Inter-crown insulation - jute, flax fiber.

Floor and ceiling beams - timber 100x150.

Subfloor - board 25x150.

The roof gables are profiled timber 140x140 mm.

Rafter system, crossbar - board 50x150.

Roof sheathing – board 25x150.

Roof covering with roofing felt.

Add. materials - self-tapping screws, nails, roofing felt, compensation screws.


Delivery.

Unloading material when a truck arrives.

Assembly of the house on the customer's site.

Get a free consultation

RUB 1,025,000

House set made of profiled timber 190x140 mm.


The house package includes:

House made of profiled timber 190x140 mm.

Internal partitions – profiled timber 90x140 mm.

The clear height of the 1st floor is 2.7m.

The clear height of the 2nd floor is 2.5m.

Connecting the corners - in a dressing with a root tenon

The beam is fastened with a wooden dowel.

Inter-crown insulation - jute, flax fiber.

Floor and ceiling beams - timber 100x150.

Subfloor - board 25x150.

The roof gables are profiled timber 190x140 mm.

Rafter system, crossbar - board 50x150.

Roof sheathing – board 25x150.

Roof covering with roofing felt.

Add. materials - self-tapping screws, nails, roofing felt, compensation screws.


"Skazka" is the optimal home for permanent residence. House area 66.43 sq. m., and its dimensions are 5 by 7. A distinctive feature of the house is the attic.

Our company will be happy to build a house according to this project. The total cost of building a house depends on the configuration. Additionally, we are ready to remodel the project free of charge or build a house according to any of your projects or sketches.

The cost of construction may differ slightly from that posted on the website.

Equipment options

Complete set of frame houses

Foundation

Pile-screw

Tape

  • Sand cushion: 300 mm

Power frame

  • Frame strapping: timber 150*150 mm
  • Vertical racks made of chamber-dried planed boards (14-18% humidity), 1 grade, 150*50 mm
  • The pitch of the racks is no more than 580 mm, using a reinforced fastening system and additional protection of the frame from “cold bridges”
  • To protect the frame: the outer side is a four-layer diffusion membrane, the inner side is a three-layer polyethylene film

Interior partitions

  • Vertical racks made of chamber-dried planed boards (14-18% humidity), 1st grade, 100*50 mm.
  • The frame posts are mounted on both sides with a vapor-permeable Izospan membrane.

Internal load-bearing walls and partitions

Thermal insulation from environmentally friendly slab basalt insulation ROCKWOOL LIGHT BATTS or Paroc EXTRA

  • External walls - 3 layers (150 mm).
  • Interior partitions - 2 layers (100 mm)
  • Interfloor ceilings - 2 layers (100 mm)
  • Attic floor (second floor ceiling) - 3 layers (150 mm)

Roofing - metal tiles

  • Steel thickness: 0.5 mm
  • Assorted colors

Exterior facade decoration

  • (Egger/Kalevala, class E1)

Interior wall decoration

Moisture-resistant OSB-3 board, 2500*1250*9 mm

Windows

  • Profile thickness 70mm
  • Fittings: ROTO NT

Complete set of block houses

Foundation

  • Sand cushion: 400 mm
  • High-strength reinforcement d12 mm class AIII
  • Factory-made concrete, grade M300 (B22.5)

Double waterproofing of the foundation is used.

Domokomplekt

Basement and interfloor ceilings

External and internal load-bearing walls

All wooden structures are antiseptic in two layers, with a special fire-bio protective composition. Installation of the power frame of the house is carried out using a galvanized fastening system with double reinforcement.

Roofing - metal tiles

  • Covering: polyester, with a quality guarantee of 15 years
  • First galvanizing class – 275 g/sq.m
  • Steel thickness: 0.5 mm
  • Assorted colors
  • Reinforced rafter system made of boards 200*50 mm, grade 1, with a pitch of 580 mm

Windows

  • Window PVC structures REHAU SIB-Design, standard sizes
  • Profile thickness 70 mm
  • 2-chamber double-glazed window (3 glasses), 5-chamber profile (white), mosquito nets
  • Fittings: ROTO NT

Complete set of brick houses

Foundation

Tape monolithic heavily reinforced pile-grillage

  • Plinth height 600 mm, tape width 400 mm
  • Bored reinforced piles with a diameter of 200 mm, a depth of 2000 mm
  • Sand cushion: 400 mm
  • High-strength reinforcement d12 mm class AIII
  • Factory-made concrete, grade M300 (B22.5)

Double waterproofing of the foundation is used.

Domokomplekt

Basement and interfloor ceilings

  • Reinforced basement and interfloor floor joists are made of 50*200 mm boards, with a pitch of no more than 580 mm
  • First floor subfloor being installed

External and internal load-bearing walls

  • External load-bearing walls made of aerated concrete (gas silicate) blocks, 300 mm thick (possibly 375 mm). Density D500
  • Internal load-bearing walls made of aerated concrete (gas silicate) blocks, 300 mm thick (possibly 375 mm). Density D500
  • Reinforcement of masonry every three rows
  • Aerated concrete (gas silicate) blocks are placed on a special masonry adhesive
  • Decorated window and door openings
  • Installation of brick reinforced belts under floors

All wooden structures are antiseptic in two layers, with a special fire-bio protective composition. Installation of the power frame of the house is carried out using a galvanized fastening system with double reinforcement.

Roofing - metal tiles

  • Covering: polyester, with a quality guarantee of 15 years
  • First galvanizing class – 275 g/sq.m
  • Steel thickness: 0.5 mm
  • Assorted colors
  • Reinforced rafter system made of boards 200*50 mm, grade 1, with a pitch of 580 mm
  • For protection roofing system Four-layer diffusion membrane is used

Windows

  • REHAU SIB-Design PVC window structures, standard sizes
  • Profile thickness 70 mm
  • 2-chamber double-glazed window (3 glasses), 5-chamber profile (white), mosquito nets
  • Fittings: ROTO NT

Complete set of timber houses

Wall material to choose from

Solid timber

Advantages:

  • Affordable price
  • Widespread
  • Minimum delivery times
  • Easy to assemble at home

Flaws:

  • Additional costs for finishing or sharpening
  • Imperfect appearance
  • Additional costs for antiseptic
  • Increased cracking

Glued laminated timber

Advantages:

  • Excellent appearance
  • Very low shrinkage and shrinkage
  • Does not crack
  • Does not require additional processing

Flaws:

  • Increased price
  • Reduced vapor permeability of the material

Profiled timber

Advantages:

  • Great look
  • Making connections with overhangs (into the bowl)
  • Tighter connection between crowns and at corner joints

Flaws:

  • The need for a break for shrinkage
  • The appearance of cracks on the surface over time

Foundation

Pile-screw

  • VS-108/300/2500mm, TU 5260-001-84045723-2011
  • Piles are driven using special equipment
  • Pile wall thickness 4 mm, blade thickness 5 mm
  • Inside the piles are filled concrete mixture M300
  • The metal head is welded, 200*200 mm
  • The pile is covered with a 2-component factory protective compound

Tape

  • Plinth height 600 mm, tape width 300 mm
  • Sand cushion: 300 mm
  • High-strength reinforcement d12 mm class AIII
  • Factory-made concrete, grade M300 (B22.5)

Double waterproofing of the foundation is used.

Domokomplekt

Basement and interfloor ceilings

  • Reinforced basement floor joists are made of 50*200 mm boards, with a pitch of no more than 580 mm
  • Reinforced interfloor joists are made from planed boards of chamber drying, grade 1, 50*200 mm (14-18% humidity), with a pitch of no more than 580 mm

External and internal load-bearing walls

  • External walls and gables made of timber 150*150 mm (possibly 200*200 mm)
  • Internal load-bearing walls made of timber 150*150 mm (possibly 200*200 mm)
  • Inter-crown insulation “jute fiber” or “flax batting” is laid between the beams in 2 layers.
  • The corners of the house are assembled using the “warm corner” technology
  • Installation of timber crowns is carried out on a wooden dowel

All wooden structures are antiseptic in two layers, with a special fire-bio protective composition. Installation of the power frame of the house is carried out using a galvanized fastening system with double reinforcement.

Roof

  • Reinforced rafter system made of boards 200*50 mm, grade 1, with a pitch of 580 mm
  • Step-by-step lathing 100*25 mm
  • Temporary is being mounted roof covering from roofing felt

Complete set of log houses

Wall material to choose from

  • Rounded (calibrated) log
  • Carriage (Norwegian cabin)
  • Planed log
  • Shaped log
  • Barked log

Foundation

Pile-screw

  • VS-108/300/2500mm, TU 5260-001-84045723-2011
  • Piles are driven using special equipment
  • Pile wall thickness 4 mm, blade thickness 5 mm
  • Inside the piles are filled with M300 concrete mixture
  • The metal head is welded, 200*200 mm
  • The pile is covered with a 2-component factory protective compound

Tape

  • Plinth height 600 mm, tape width 300 mm
  • Sand cushion: 300 mm
  • High-strength reinforcement d12 mm class AIII
  • Factory-made concrete, grade M300 (B22.5)

Double waterproofing of the foundation is used.

Domokomplekt

Basement and interfloor ceilings

  • Reinforced basement floor joists are made of 50*200 mm boards, with a pitch of no more than 580 mm
  • Reinforced interfloor joists are made from planed boards of chamber drying, grade 1, 50*200 mm (14-18% humidity), with a pitch of no more than 580 mm

External and internal load-bearing walls

  • External walls and gables made of logs 240 mm (possibly 280 mm)
  • Internal load-bearing walls made of logs 240 mm (possibly 280 mm)
  • Inter-crown insulation “jute fiber” or “flax batting” is laid between the logs in 2 layers.
  • Dowels, sealing tape for sealing
  • Beams - treated with a fire-retardant composition.

All wooden structures are antiseptic in two layers, with a special fire-bio protective composition. Installation of the power frame of the house is carried out using a galvanized fastening system with double reinforcement.

Roofing - metal tiles

  • Covering: polyester, with a quality guarantee of 15 years
  • First galvanizing class – 275 g/sq.m
  • Steel thickness: 0.5 mm
  • Assorted colors
  • Reinforced rafter system made of boards 200*50 mm, grade 1, with a pitch of 580 mm
  • A four-layer diffusion membrane is used to protect the roofing system

Complete set of houses from SIP panels

Foundation

Pile-screw

  • VS-108/300/2500mm, TU 5260-001-84045723-2011
  • Piles are driven using special equipment
  • Pile wall thickness 4 mm, blade thickness 5 mm
  • Inside the piles are filled with M300 concrete mixture
  • The metal head is welded, 200*200 mm
  • The pile is covered with a 2-component factory protective compound

Tape

  • Plinth height 600 mm, tape width 300 mm
  • Sand cushion: 300 mm
  • High-strength reinforcement d12 mm class AIII
  • Factory-made concrete, grade M300 (B22.5)

Double waterproofing of the foundation is used.

Internal load-bearing walls and partitions

  • Performed using frame technology
  • Vertical racks made of chamber-dried planed boards (14-18% humidity), 1st grade, 100*50 mm and 150*50 mm

Roofing system

  • To protect the roofing system: the outer side is a four-layer diffusion membrane, the inner side is a three-layer polyethylene film.

All wooden structures are antiseptic in two layers, with a special fire-bio protective composition. Installation of the power frame of the house is carried out using a galvanized fastening system with double reinforcement.

Thermal insulation

  • External walls - non-flammable polystyrene foam (150 mm)
  • Interior partitions - environmentally friendly slab basalt insulation (100 mm)
  • The floor of the first floor is non-flammable polystyrene foam (150 mm)
  • Attic floor (second floor ceiling) - environmentally friendly slab basalt insulation (100 mm)

Roofing - metal tiles

  • Covering: polyester, with a quality guarantee of 15 years
  • First galvanizing class – 275 g/sq.m
  • Steel thickness: 0.5 mm
  • Assorted colors

Exterior facade decoration

  • Ventilated facade: counter-lattice made of timber 35*35 mm
  • Painted galvanized ebbs are mounted on the base along the outer perimeter

Interior wall decoration

Moisture-resistant OSB-3 board, 2500*1250*9 mm

Windows

  • REHAU SIB-Design PVC window structures, standard sizes
  • Profile thickness 70mm
  • 2-chamber double-glazed window (3 glasses), 5-chamber profile (white), mosquito nets
  • Fittings: ROTO NT

More details about the package

  • foundation plan;
  • roof plan;
  • rafter plan;
  • wall scans;
  • specification of components;
  • components, details.

2.1. Foundation structure:
  • Pile metal foundation below freezing depth with pouring of piles with concrete. Metal piles D=108mm with a pitch of 2.5-3m >with a laying depth below the freezing depth.
2.3.Installation of external and internal load-bearing walls from a frame with a cross-section of 140x35 mm with additional insulation of 50 mm and internal partitions 90x35 mm treated with NEOMID antiseptic:
  • Frame with a cross-section of 140x35 mm, dry planed, with a 50 mm overlap insulation device, with a hydro-wind protection device on the outside, with external cladding made of imitation timber 145x20 mm.
2. Optimal equipment

More details about the package

1. Development of design documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roof plan;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • joinery specification;
  • wall scans;
  • specification of components;
  • components, details.

2. Construction and installation work on site:

2.1. Foundation structure:
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with technical report based on soil survey results.
2.2. Basement installation:
  • The basement floor is made of wooden beams with a section of 200x50 mm with a subfloor of 25x100 mm, laying 150 mm of insulation and a vapor barrier and waterproofing device. The floors are made of dry planed tongue and groove boards 28 mm.
  • Frame with a cross-section of 140x35 mm, dry planed, with a ventilation gap, and filled with 200 mm mineral wool insulation, a vapor-tight membrane, with inside premises and hydro-wind protection from the outside, and facing from the outside and inside with imitation timber 145x20 mm. Installation of partitions from timber with a cross-section of 90x35 mm, filled with 100 mm mineral wool insulation.
2.4. Interfloor covering arrangement:
  • Interfloor covering is carried out according to wooden beams section 200x50 mm, section and steps in accordance with the project, with installation of 150 mm insulation. and a vapor barrier and hydro-wind protection device. The floors are made of dry planed tongue and groove boards 28 mm. Eurolining ceilings 12.5 mm on the 1st floor.
2.5.Installation rafter system and installation of metal roofing:
2.6. Installation of joinery:
2.7. Installation of temporary interfloor stairs:
  • Internal interfloor wooden staircase with steps, without risers, with fencing and railings, made of planed softwood.
3. Comfort package

More details about the package

1. Development of design documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roof plan;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • joinery specification;
  • wall scans;
  • specification of components;
  • components, details.

2. Construction and installation work on site:

2.1. Foundation structure:
  • The foundation is piled with a monolithic grillage with a reinforced section of 250 x 400 mm, made of concrete grade B22.5 (M300) with general reinforcement with AIII ø 12 reinforcement in the longitudinal direction and transverse and vertical lintels with AIII ø 12 reinforcement in increments of 400 mm. with installation of vents for ventilation; reinforced concrete piles with a diameter of 250 mm with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical conclusion based on the results of a soil survey.
2.2. Basement installation:
  • The basement floor is made of wooden beams with a section of 200x50 mm with a subfloor of 25x100 mm, with the installation of 200 mm insulation and a vapor barrier and waterproofing device. The floors are made of dry planed tongue and groove boards 36 mm.
2.3. Installation of external and internal load-bearing walls made of a frame with a cross-section of 140x35 mm with additional insulation of 50 mm and internal partitions 90x35 mm treated with NEOMID antiseptic:
  • Frame with a cross-section of 140x35 mm, dry planed with a ventilation gap, and filled with 200 mm mineral wool insulation, a vapor-tight membrane on the inside of the room and hydro-wind protection on the outside, and cladding on the outside and inside with imitation timber 145x20 mm. Installation of partitions from timber with a section of 90x35 mm , filled with 100 mm mineral wool insulation and faced with imitation timber 145x20 mm.
2.4. Interfloor covering arrangement:
2.6. Installation of joinery:
  • Installation in the openings of 60 mm plastic windows with a tilt-and-turn mechanism and double-glazed windows, fittings, white;
  • Installation of an external entrance door.
2.7. Installation of temporary interfloor stairs:
  • The internal interfloor wooden staircase with steps, without risers, with fencing and railings is made of planed coniferous wood.
1. Basic equipment

An excellent option for those who are currently limited in finances, but have unlimited possibilities. By choosing this package, you can complete the finishing yourself or order it later in a more favorable financial situation!

More details about the package

1. Development of design documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roof plan;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • joinery specification;
  • wall scans;
  • specification of components;
  • components, details.

2. Construction and installation work on site:

2.1. Foundation structure:
  • The foundation is piled with a monolithic grillage with a reinforced section of 250 x 400 mm, made of concrete grade B22.5 (M300) with general reinforcement with AIII ø 12 reinforcement in the longitudinal direction and transverse and vertical lintels with AIII ø 12 reinforcement in increments of 400 mm. with installation of vents for ventilation; reinforced concrete piles with a diameter of 250 mm with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical conclusion based on the results of a soil survey.
2.2. Basement installation:
  • The basement floor is made of wooden beams with a section of 200x50 mm.

Assembly of a ready-made wall kit from laminated veneer lumber with a cross-section of 140x180 mm, manufactured at the enterprise, including:

2.4. Interfloor covering arrangement:
  • The interfloor ceiling is made using wooden beams, sections and steps in accordance with the design, with a section of 200x50 mm.
  • This stage includes the installation of a wooden rafter system, timber with a cross-section of 200x50 mm, with a hydro-wind protection device.
  • The roof covering is made of metal tiles on a 40x40 mm block with ventilation of the under-roof space, eliminating the formation of condensation and ensuring compliance with SNiP.
2.6. Installation of joinery:
  • Installation in the openings of 60 mm plastic windows with a tilt-and-turn mechanism and double-glazed windows, fittings, white;
  • Installation of an external entrance door.
2.7. Installation of temporary interfloor stairs:
  • The internal interfloor wooden staircase with steps, without risers, with fencing and railings is made of planed coniferous wood.
2. Optimal equipment

An ideal option for those who want to get a ready-to-move-in home for reasonable money! The best price-quality option, in this configuration you will get a noble aesthetic appearance, comfort and ease of use.

More details about the package

1. Development of design documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roof plan;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • joinery specification;
  • wall scans;
  • specification of components;
  • components, details.

2. Construction and installation work on site:

2.1. Foundation structure:
  • The foundation is piled with a monolithic grillage with a reinforced section of 250 x 400 mm, made of concrete grade B22.5 (M300) with general reinforcement with AIII ø 12 reinforcement in the longitudinal direction and transverse and vertical lintels with AIII ø 12 reinforcement in increments of 400 mm. with installation of vents for ventilation; reinforced concrete piles with a diameter of 250 mm with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical conclusion based on the results of a soil survey.
2.2. Basement installation:
2.3. Installation of external and interior walls from factory parts of laminated veneer lumber:

Assembly of a ready-made wall kit from laminated veneer lumber with a cross-section of 140x180 mm, manufactured at the enterprise, including:

  • Primary antiseptic treatment of timber using the dipping method;
  • 100% factory production according to the size of a set of timber parts with cut mounting grooves, ensuring fixation of the timber in two directions, marked according to the project, as well as carrying out control assembly of the kit on the covered area of ​​the plant to assess the quality.
  • The assembly of the house crowns is carried out on round wooden dowels (birch) with double insulation with flax wool, using tie rods and clamping screws according to the project, installation wooden structures casing for installing window and wooden blocks.
2.4. Interfloor covering arrangement:
2.5. Installation of the rafter system and installation of metal roofing:
  • This stage includes the installation of a wooden rafter system, timber with a cross-section of 200x50 mm, with a hydro-wind protection device.
  • The roof covering is made of metal tiles on a 40x40 mm block with ventilation of the under-roof space, eliminating the formation of condensation and ensuring compliance with SNiP.
2.6. Installation of joinery:
  • Installation in the openings of 60 mm plastic windows with a tilt-and-turn mechanism and double-glazed windows, fittings, white;
  • Installation of an external entrance door.
2.7. Installation of temporary interfloor stairs:
  • The internal interfloor wooden staircase with steps, without risers, with fencing and railings is made of planed coniferous wood.
3. Comfort package

Construction country house“turnkey” for a comfortable stay using only the best, environmentally friendly finishing materials top quality in order to emphasize the status of your home.

More details about the package

1. Development of design documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roof plan;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • joinery specification;
  • wall scans;
  • specification of components;
  • components, details.

2. Construction and installation work on site:

2.1. Foundation structure:
  • The foundation is piled with a monolithic grillage with a reinforced section of 250 x 400 mm, made of concrete grade B22.5 (M300) with general reinforcement with AIII ø 12 reinforcement in the longitudinal direction and transverse and vertical lintels with AIII ø 12 reinforcement in increments of 400 mm. with installation of vents for ventilation; reinforced concrete piles with a diameter of 250 mm with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical conclusion based on the results of a soil survey.
2.2. Basement installation:
2.3. Installation of external and internal walls from factory parts of laminated veneer lumber:

Assembly of a ready-made wall kit from laminated veneer lumber with a cross-section of 190x210 mm, manufactured at the enterprise, including:

  • Primary antiseptic treatment of timber using the dipping method;
  • 100% factory production to size of a set of timber parts with cut mounting grooves, ensuring fixation of the timber in two directions, marked according to the project, as well as control assembly of the kit on the covered area of ​​the plant to assess the quality.
  • The assembly of the crowns of the house is carried out on round wooden dowels (birch) with double insulation with flax wool, using tie rods and clamping screws according to the project, installation of wooden casing structures for the installation of window and wooden blocks.
2.4. Interfloor covering arrangement:
  • The interfloor ceiling is carried out on wooden beams with a section of 200x50 mm, section and steps in accordance with the project, with 200 mm of insulation laid. and a vapor barrier and hydro-wind protection device. The floors are made of dry planed tongue and groove boards 36 mm. Ceilings with imitation timber 145x20 mm 1st floor.
2.5. Installation of the rafter system and installation of metal roofing:
  • This stage includes the installation of a wooden rafter system with a beam cross-section of 200x50 mm, with insulation basalt insulation 200mm thick, with vapor barrier and hydro-wind protection.
  • The roof covering is made from soft tiles Shinglas (“SHINGLAS”) on a continuous flooring made of oriented strand board (OSB) 9 mm with ventilation of the under-roof space, a block with a cross-section of 40x40 mm, which eliminates the formation of condensation and ensures compliance with SNiP.
  • Hemming the overhangs with “STILE” clapboard, 14 mm thick.
2.6. Installation of joinery:
  • Installation in the openings of 60 mm plastic windows with a tilt-and-turn mechanism and double-glazed windows, fittings, white;
  • Installation of an external entrance door.
2.7. Installation of temporary interfloor stairs:
  • The internal interfloor wooden staircase with steps, without risers, with fencing and railings is made of planed coniferous wood.
1. Basic equipment

An excellent option for those who are currently limited in finances, but have unlimited possibilities. By choosing this package, you can complete the finishing yourself or order it later in a more favorable financial situation!

More details about the package

1. Development of design documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roof plan;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • joinery specification;
  • wall scans;
  • specification of components;
  • components, details.

2. Construction and installation work on site:

2.1. Foundation structure:
  • Pile metal foundation below freezing depth with pouring of piles with concrete. Metal piles D=108mm with a pitch of 2.5-3m with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical conclusion based on the results of a soil survey.
2.2. Basement installation:
  • The basement floor is made of wooden beams with a section of 200x50 mm.
  • Primary antiseptic treatment of timber using the dipping method;
  • The assembly of the crowns of the house is carried out on round wooden dowels (birch) with double insulation with flax wool, using tie rods and clamping screws according to the project, installation of wooden casing structures for the installation of window and wooden blocks.
2.4. Interfloor covering arrangement:
  • The interfloor ceiling is made using wooden beams, sections and steps in accordance with the design, with a section of 200x50 mm.
2.5. Installation of the rafter system and installation of metal roofing:
  • This stage includes the installation of a wooden rafter system, timber with a cross-section of 200x50 mm, with a hydro-wind protection device.
  • The roof covering is made of metal tiles on a 40x40 mm block with ventilation of the under-roof space, eliminating the formation of condensation and ensuring compliance with SNiP.
2.6. Installation of joinery:
  • Installation in the openings of 60 mm plastic windows with a tilt-and-turn mechanism and double-glazed windows, fittings, white;
  • Installation of an external entrance door.
2.7. Installation of temporary interfloor stairs:
  • The internal interfloor wooden staircase with steps, without risers, with fencing and railings is made of planed coniferous wood.
2. Optimal equipment

An ideal option for those who want to get a ready-to-move-in home for reasonable money! The best price-quality option, in this configuration you will get a noble aesthetic appearance, comfort and ease of use.

More details about the package

1. Development of design documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roof plan;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • joinery specification;
  • wall scans;
  • specification of components;
  • components, details.

2. Construction and installation work on site:

2.1. Foundation structure:
  • The foundation is piled with a monolithic grillage with a reinforced section of 250 x 400 mm, made of concrete grade B22.5 (M300) with general reinforcement with AIII ø 12 reinforcement in the longitudinal direction and transverse and vertical lintels with AIII ø 12 reinforcement in increments of 400 mm. with installation of vents for ventilation; reinforced concrete piles with a diameter of 250 mm with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical conclusion based on the results of a soil survey.
2.2. Basement installation:
  • The basement floor is made of wooden beams with a section of 200x50 mm with a subfloor of 25x100 mm on a 50x50 mm cranial beam, with the installation of 150 mm insulation and a vapor barrier and hydro-wind protection device. The floors are made of dry planed tongue and groove boards 36 mm.
2.3. Installation of external and internal walls from factory parts of profiled timber:

Assembly of a finished wall kit from profiled timber with a section of 145x145 mm, manufactured including:

  • Preparation of timber for the manufacture of parts - its chamber drying timber;
  • Primary antiseptic treatment of timber using the dipping method;
  • 100% factory production according to the size of the kit with cut mounting grooves, marked according to the project, as well as control assembly of the kit in a covered area of ​​the factory to assess the quality.
  • The assembly of the crowns of the house is carried out on round wooden dowels (birch) with double insulation with flax wool, using tie rods and clamping screws according to the project, installation of wooden casing structures for the installation of window and wooden blocks.
2.4. Interfloor covering arrangement:
  • The interfloor ceiling is carried out on wooden beams with a section of 200x50 mm, section and steps in accordance with the project, with 200 mm of insulation laid. and a vapor barrier and hydro-wind protection device. The floors are made of dry planed tongue and groove boards 36 mm. Eurolining ceilings 12.5 mm on the 1st floor.
2.5. Installation of the rafter system and installation of metal roofing:
  • This stage includes the installation of a wooden rafter system with a beam cross-section of 200x50 mm, insulated with 200 mm thick mineral wool, with a vapor barrier and hydro-wind protection device.
  • The roof covering is made of metal tiles on a 40*40 block with ventilation of the under-roof space, eliminating the formation of condensation and ensuring compliance with SNiP.
2.6. Installation of joinery:
  • Installation in the openings of 60 mm plastic windows with a tilt-and-turn mechanism and double-glazed windows, fittings, white;
  • Installation of an external entrance door.
2.7. Installation of temporary interfloor stairs:
  • The internal interfloor wooden staircase with steps, without risers, with fencing and railings is made of planed coniferous wood.
3. Comfort package

Construction of a turnkey country house for comfortable living using only the best, environmentally friendly finishing materials of the highest quality in order to emphasize the status of your home.

More details about the package

1. Development of design documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roof plan;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • joinery specification;
  • wall scans;
  • specification of components;
  • components, details.

2. Construction and installation work on site:

2.1. Foundation structure:
  • The foundation is piled with a monolithic grillage with a reinforced section of 250 x 400 mm, made of concrete grade B22.5 (M300) with general reinforcement with AIII ø 12 reinforcement in the longitudinal direction and transverse and vertical lintels with AIII ø 12 reinforcement in increments of 400 mm. with installation of vents for ventilation; reinforced concrete piles with a diameter of 250 mm with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical conclusion based on the results of a soil survey.
2.2. Basement installation:
  • Monolithic reinforced in several rows reinforced concrete slab 150 mm thick corrugated sheet, with a waterproofing device (Gidroizol), insulation with 150 mm extruded polystyrene foam and a reinforced screed 50 mm thick. for laying tiles, laminate, etc.
2.3. Installation of external and internal walls from factory parts of profiled timber:

Assembly of a finished wall kit from profiled timber with a section of 190x190 mm, manufactured including:

  • Preparation of timber for the manufacture of parts - chamber drying of the timber;
  • Primary antiseptic treatment of timber using the dipping method;
  • 100% factory production according to the size of the kit with cut mounting grooves, marked according to the project, as well as control assembly of the kit in a covered area of ​​the factory to assess the quality.
  • The assembly of the crowns of the house is carried out on round wooden dowels (birch) with double insulation with flax wool, using tie rods and clamping screws according to the project, installation of wooden casing structures for the installation of window and wooden blocks.
2.4. Interfloor covering arrangement:
  • The interfloor ceiling is carried out on wooden beams with a section of 200x50 mm, section and steps in accordance with the project, with 200 mm of insulation laid. and a vapor barrier and hydro-wind protection device. The floors are made of dry planed tongue and groove boards 36 mm. Eurolining ceilings 12.5 mm on the 1st floor.
2.5. Installation of a rafter system and installation of a roof made of soft Shinglas tiles (“SHINGLAS”):
  • This stage includes the installation of a wooden rafter system with a beam cross-section of 200x50 mm, insulated with basalt insulation 200 mm thick, with a vapor barrier and waterproofing device.
  • The roof covering is made of soft Shinglas tiles (“SHINGLAS”) on a continuous flooring of oriented strand board (OSB) 9 mm with ventilation of the under-roof space made of a block with a cross-section of 40x40 mm, which eliminates the formation of condensation and ensures compliance with SNiP.
  • Hemming the overhangs with “STILE” clapboard, 14 mm thick.
2.6. Installation of joinery:
  • Installation in the openings of 60 mm plastic windows with a tilt-and-turn mechanism and double-glazed windows, fittings, white;
  • Installation of an external entrance door.
2.7. Installation of temporary interfloor stairs:
  • The internal interfloor wooden staircase with steps, without risers, with fencing and railings is made of planed coniferous wood.
1. Basic equipment

An excellent option for those who are currently limited in finances, but have unlimited possibilities. By choosing this package, you can complete the finishing yourself or order it later in a more favorable financial situation!

More details about the package

1. Development of design documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roof plan;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • joinery specification;
  • wall scans;
  • specification of components;
  • components, details.

2. Construction and installation work on site:

2.1. Foundation structure:
  • The foundation is piled with a monolithic grillage with a reinforced section of 250 x 400 mm, made of concrete grade B22.5 (M300) with general reinforcement with AIII ø 12 reinforcement in the longitudinal direction and transverse and vertical lintels with AIII ø 12 reinforcement in increments of 400 mm. with installation of vents for ventilation; reinforced concrete piles with a diameter of 250 mm with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical conclusion based on the results of a soil survey.
2.2. Basement installation:
  • The basement floor is made of wooden beams with a section of 200x50 mm.
2.4. Interfloor covering arrangement:
  • The interfloor ceiling is made using wooden beams, sections and steps in accordance with the design, with a section of 200x50 mm.
2.5. Installation of the rafter system and installation of metal roofing:
  • This stage includes the installation of a wooden rafter system, timber with a cross-section of 200x50 mm, with a hydro-wind protection device.
  • The roof covering is made of metal tiles on a 40x40 mm block with ventilation of the under-roof space, eliminating the formation of condensation and ensuring compliance with SNiP.
2.6. Installation of joinery:
  • Installation in the openings of 60 mm plastic windows with a tilt-and-turn mechanism and double-glazed windows, fittings, white;
  • Installation of an external entrance door.
2.7. Installation of temporary interfloor stairs:
  • The internal interfloor wooden staircase with steps, without risers, with fencing and railings is made of planed coniferous wood.
  • joinery specification;
  • wall scans;
  • specification of components;
  • components, details.

2. Construction and installation work on site:

2.1. Foundation structure:
  • The foundation is piled with a monolithic grillage with a reinforced section of 250 x 400 mm, made of concrete grade B22.5 (M300) with general reinforcement with AIII ø 12 reinforcement in the longitudinal direction and transverse and vertical lintels with AIII ø 12 reinforcement in increments of 400 mm. with installation of vents for ventilation; reinforced concrete piles with a diameter of 250 mm with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical conclusion based on the results of a soil survey.
2.2. Basement installation:
  • Monolithic reinforced concrete slab reinforced in several rows with a thickness of 150 mm corrugated sheeting.
2.3. Installation of external and internal walls made of aerated concrete blocks 300 mm thick:
  • Assembly of load-bearing external and internal walls from aerated concrete blocks 625x250x300 mm, and internal partitions from aerated concrete blocks 625x250x100 mm density D500, assembly with glue with laying of masonry mesh in rows, with reinforced monolithic belts interfloor ceilings and jumpers;
  • Installation of a decorative plaster facade with additional insulation 30 mm, CERESIT VWS INSULATION SYSTEMS BASED ON FOAM POLYSTEROL, texture “bark beetle” 2.5 mm, plaster Ceresit ST 35 “bark beetle” 2.5 mm color white.
2.4. Interfloor covering arrangement:
2.5. Installation of the rafter system and installation of metal roofing:
  • This stage includes the installation of a wooden rafter system with a beam cross-section of 200x50 mm, insulated with 200 mm thick mineral wool, with a vapor barrier and hydro-wind protection device.
  • The roof covering is made of metal tiles on a 40*40 block with ventilation of the under-roof space, eliminating the formation of condensation and ensuring compliance with SNiP.
2.6. Installation of joinery:
  • Installation in the openings of 60 mm plastic windows with a tilt-and-turn mechanism and double-glazed windows, fittings, white;
  • Installation of an external entrance door.
2.7. Installation of temporary interfloor stairs:
  • The internal interfloor wooden staircase with steps, without risers, with fencing and railings is made of planed coniferous wood.
3. Comfort package

Construction of a turnkey country house for comfortable living using only the best, environmentally friendly finishing materials of the highest quality in order to emphasize the status of your home.

More details about the package

1. Development of design documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roof plan;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • joinery specification;
  • wall scans;
  • specification of components;
  • components, details.

2. Construction and installation work on site:

2.1. Foundation structure:
  • The foundation is piled with a monolithic grillage with a reinforced section of 250 x 400 mm, made of concrete grade B22.5 (M300) with general reinforcement with AIII ø 12 reinforcement in the longitudinal direction and transverse and vertical lintels with AIII ø 12 reinforcement in increments of 400 mm. with installation of vents for ventilation; reinforced concrete piles with a diameter of 250 mm with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical conclusion based on the results of a soil survey.
2.2. Basement installation:
  • Monolithic reinforced concrete slab 150 mm thick reinforced in several rows with corrugated sheets, with a waterproofing device (Gidroizol), insulation with 150 mm extruded polystyrene foam and a reinforced screed 50 mm thick. for laying tiles, laminate, etc.
2.3. Installation of external and internal walls made of aerated concrete blocks 300 mm thick:
  • Assembly of load-bearing external and internal walls from aerated concrete blocks 625x250x300 mm, and internal partitions from aerated concrete blocks 625x250x100 mm density D500, assembly with glue with laying of masonry mesh in rows, with reinforced monolithic belts of interfloor floors and lintels.
  • Installation of a decorative plaster facade with additional insulation 100 mm, CERESIT VWS INSULATION SYSTEMS BASED ON FOAM POLYSTEROL, texture “bark beetle” 3.5 mm, plaster Ceresit ST 35 “bark beetle” 3.5 mm color white.
2.4. Interfloor covering arrangement:
  • The interfloor ceiling is a monolithic reinforced concrete slab reinforced in several rows with a thickness of 150 mm and corrugated sheeting.
2.5. Installation of a rafter system and installation of a roof made of soft Shinglas tiles (“SHINGLAS”):
  • This stage includes the installation of a wooden rafter system with a beam cross-section of 200x50 mm, insulated with basalt insulation 200 mm thick, with a vapor barrier and waterproofing device.
  • The roof covering is made of soft Shinglas tiles (“SHINGLAS”) on a continuous flooring of oriented strand board (OSB) 9 mm with ventilation of the under-roof space made of a block with a cross-section of 40x40 mm, which eliminates the formation of condensation and ensures compliance with SNiP.
  • Hemming the overhangs with “STILE” clapboard, 14 mm thick.
2.6. Installation of joinery:
  • Installation in the openings of 60 mm plastic windows with a tilt-and-turn mechanism and double-glazed windows, fittings, white;
  • Installation of an external entrance door.
2.7. Installation of temporary interfloor stairs:
  • The internal interfloor wooden staircase with steps, without risers, with fencing and railings is made of planed coniferous wood.


Related publications